Catálogo de proyectos
 
			Bifurcation
Picachos Dam, Sinaloa, Mex. Manufacture of branch for the pressure pipe.
 
			Casting ladle
18 m3 Carbon steel casting ladle for the reception and handling of just-molted steel.
 
			Flotation Column
Alabama USA Mine
Flotation column 5.50 m diameter X 14 m high manufactured in 4 screwable sections.
 
			Turbine discharge pipe elbows
Hydroelectric Power Plant,
San Rafael, Nayarit.
Turbine discharge pipe elbows for a Hydropower plant, CFE 2014.
 
			Radial floodgates
Amata Regulation Dam,
Sinaloa, México.
Manufacturing, installation and testing of radial gates for a lock aqueduct, 2005.
 
			Roller gate
Picachos Dam, Sinaloa, Mexico
Three, wheeled watergate for river divertion tunnel.
 
			Thickener
Caborca, Sonora, 2011.
45-m. Diameter Thickeners for a gold and silver mine.
 
			Thickener
El Saucito mine, Zacatecas.
Trial fit. 18-mt diameter thickener. Peñoles-2010
 
			Food industry
Jalisco, México 2015.
180 m3 capacity stainless steel product storage tank.
 
			C.P. Latina
Cerro Prieto Geothermal Field.
Module 1 installation in the “separation island” no. 3 / CFE, 2005
 
			Cerro Prieto Geothermal Power Plant
Cerro Prieto, Baja California, México.
Equipping of module 1 in the “separation island” No. 3/ CFE, 2005.
 
			Geothermal Power Plant
C.G. Berlín, El Salvador.
Geothermal fluid separation station. CEL /1999
 
			Hermetic Door
C.H. El Níspero, Honduras.
Hermetic gate with inspection opening. Reinforced for back pressure in a pressurized tunnel.
 
			Atizcoa bridge
Guadalajara- Tepic Highway, 1994
 
			Carbon steel pressure vessel
Thrimethylamine Storage tank 50 m3 capacity, 2016
 
			El Marquez Bridge
Autopista Morelia- Lázaro Cárdenas
Metal structure for vehicular bridge. SCT 2002.
 
			Thickener
Mina el Saucito, Zacatecas
18m diameter thickener, 2010
 
			Water-Steam separator
Steam separator with integrated water tank, 2016
 
			Mina Peñasquito Zacatecas México
Flotation column installed on site.
 
			John Zink Combustion Chamber
List for departure to the United States
 
			Torispherical head
in carbon steel with an approximate diameter of 2.10 meters and 5/8 thickness
 
			Oxidador Térmico
Thermal oxidizer weighing 56 tons during shipment to Texas, United States
 
			Tequila Industry Boiler
300, 400 and 500 HP smoke tube boilers
 
			Suction Elbow
Manufacturing in plant
 
			Columns for activated carbon
For gold recovery
 
			Geothermal Power Plant
Planta Geotérmica Berlín
Assembly on site
 
			Vapor Separator
in plant boarding
 
			Forming press
Large cap forming press.
 
			Torispherical cap brow
 
			Condensate tank
Tanque de condensado de vapor 12,700 Lts
 
			Oil Cooker Industry
4-meter diameter ASME stamped equipment with 7 Cooking trays -2008
 
			Welding processes
FCAW, GMAW, SMAW, TIG
 
			Water Separator
Cerro Prieto BC
Vapor Water separation
 
			Solid particles in liquid media Separator for thickeners
 
			Dust Collector
For sandblast and paint chamber
 
			San Pedro Dome
San Pedro dome geothermal water steam separator for Dragon Group in Nayarit
 
			Flotation Column
Lower section of flotation column with pipes, valves and instruments presented pre-assembled in the workshop.
 
			Storage tank
Jet fuel storage tank
 
			Silos installed in plant
Dust collector installed in plant
 
			Flute Geothermal Silencer
Stainless steel header pipe and branches for Geothermal rock mufflers.



 English
English				 Español de México
Español de México