Our company’s growth is based on our constant effort to attend to the expanding specialty sectors in the market. We have invested in the necessary resources to offer our clients self-sufficient working facilities, with high-capacity machinery and equipment, and a highly-skilled human team to face the everyday challenges in our activity.
COMMSA has been distinguished by its great professionalism and enthusiasm in fulfilling an utmost priority: Improvement.
Penstock Wye-Bifurcation.
Picachos Dam, Sinaloa, Mex.
Manufacturing of a carbon steel Wye-Bifurcation for a 3.5 m diameter Penstock.
Manufacturing of a carbon steel Wye-Bifurcation for a 3.5 m diameter Penstock.
Casting ladle
18 m3 Carbon steel casting ladle for the reception and handling of just-molted steel.
Flotation cells
Alabama USA Mine
Stainless steel flotation cells. 20,000-liter tank capacity.
Stainless steel flotation cells. 20,000-liter tank capacity.
Turbine discharge pipe elbows
Hydroelectric Power Plant, San Rafael Nayarit.
Turbine discharge pipe elbows for a Hydropower plant, CFE 2014
Turbine discharge pipe elbows for a Hydropower plant, CFE 2014
Radial floodgates
Amata Regulation Dam, Sinaloa, Mexico.
Manufacturing, installation and testing of radial gates for a lock aqueduct, 2005.
Manufacturing, installation and testing of radial gates for a lock aqueduct, 2005.
Roller gate
Picachos Dam, Sinaloa, Mexico
Three, wheeled watergate for river divertion tunnel
Three, wheeled watergate for river divertion tunnel
Vegetable Oil Industry
Cooker
4-meter diameter ASME stamped equipment with 7 Cooking trays -2008
4-meter diameter ASME stamped equipment with 7 Cooking trays -2008
Thickener
El Saucito mine, Zacatecas
Trial fit. 18-mt diameter thickener. Peñoles-2010
Trial fit. 18-mt diameter thickener. Peñoles-2010
La Herradura 3
Caborca, Sonora, 2011.
45-m. Diameter Thickeners for a gold and silver mine.
45-m. Diameter Thickeners for a gold and silver mine.
C.P. Latina
Cerro Prieto Geothermal Field.
Module 1 installation in the “separation island” no. 3 / CFE, 2005
Module 1 installation in the “separation island” no. 3 / CFE, 2005
Vegetable oil Industry
Jalisco, Mexico 2015.
180 m3 capacity stainless steel product storage tank.
180 m3 capacity stainless steel product storage tank.
Berlín Geothermal Power Plant.
Usulutan, El Salvador, C.A.
Geothermal fluid separation station. CEL /1999
Geothermal fluid separation station. CEL /1999
Cerro Prieto Geothermal Power Plant.
Cerro Prieto, Baja California, Mexico.
Equipping of module 1 in the “separation island” No. 3/ CFE, 2005.
Equipping of module 1 in the “separation island” No. 3/ CFE, 2005.
Atizcoa bridge
Guadalajara- Tepic Highway, 1994
Hermetic Door
El Nispero Hydropower plant, Honduras.
Hermetic gate with inspection opening. Reinforced for back pressure in a pressurized tunnel.
Hermetic gate with inspection opening. Reinforced for back pressure in a pressurized tunnel.
El Marquez Bridge
Morelia- Lázaro Cardenas Highway, Mexico.
Fabrication of the steel bridge superstructure/ SCT 2002
Fabrication of the steel bridge superstructure/ SCT 2002
Separators
CFE 2005
Manufacturing of geothermal equipment for water-steam separation
Manufacturing of geothermal equipment for water-steam separation
Water-Steam separator
Domo San Pedro Geothermal Field, Nayarit, Mexico.
Steam separator with integrated water tank, 2016
Steam separator with integrated water tank, 2016
Carbon steel pressure vessel
Carbon steel pressure vessel
Thrimethylamine Storage tank 50 m3 capacity, 2016
Thrimethylamine Storage tank 50 m3 capacity, 2016
Silencer
Domo San Pedro
Stainless steel header pipe and branches for Geothermal rock mufflers.
Stainless steel header pipe and branches for Geothermal rock mufflers.